Prefabricated Workforce Housing Units Buildings
| Item | Specification |
| Life span | 12-15 years |
| Wind resistance | 88.2-117 km/h |
| Earthquake resistance | 7 grade |
| Structure | steel structure |
| Partition wall | sandwich panel |
| Wall | sandwich panel |
| Roof | sandwich panel |
| Windows | PVC sliding window |
| Doors | steel door/sandwich panel door |
| Time to install | 100 sqm by 4 workers /day |
| Color | blue, white, red |
| Fireproof | B2 B1 A2, A1 |


Prefab construction takes significantly less time to build than on-site construction. In many instances, prefabrication takes less than half the time when compared to traditional construction. This is due to better upfront planning, elimination of on-site weather factors, subcontractor scheduling delays, and quicker fabrication as multiple pieces can be constructed simultaneously. Shorter construction times allow construction companies to take on multiple projects at once.