
Edifícios de unidades de alojamento pré-fabricadas para trabalhadores
| Item | Especificação |
| Tempo de vida | 12-15 anos |
| Resistência ao vento | 88,2-117 km/h |
| Resistência aos sismos | 7 grau |
| Estrutura | estrutura de aço |
| Parede divisória | painel sanduíche |
| Parede | painel sanduíche |
| Telhado | painel sanduíche |
| Janelas | PVC sliding window |
| Portas | steel door/sandwich panel door |
| Tempo para instalar | 100 m2 por 4 trabalhadores /dia |
| Cor | blue, white, red |
| À prova de fogo | B2 B1 A2, A1 |


Prefab construction takes significantly less time to build than on-site construction. In many instances, prefabrication takes less than half the time when compared to traditional construction. This is due to better upfront planning, elimination of on-site weather factors, subcontractor scheduling delays, and quicker fabrication as multiple pieces can be constructed simultaneously. Shorter construction times allow construction companies to take on multiple projects at once.
EMAIL : info@hig-housing.com












Rede IPv6 suportada
